Reserve

Reserve description text

Reserve

Kontakt

Contact description text

Aerospace Material Reliability Testing Instrument Helps Aerospace Enterprise Ensure Product Safety

2026-01-15

Aktueller Firmenfall über Aerospace Material Reliability Testing Instrument Helps Aerospace Enterprise Ensure Product Safety
Case Detail
Cooperation Background:

An aerospace manufacturing enterprise engaged in the production of aircraft structural parts and engine components has extremely high requirements for the reliability and safety of materials. The original testing equipment could not meet the high-precision testing requirements of aerospace-grade materials, especially in terms of material fatigue resistance and high-temperature resistance testing. It was urgent to introduce professional testing equipment that meets national aerospace standards.

EUATEC Solution:

EUATEC customized a set of aerospace material reliability testing solutions for the enterprise, core equipment including EAM-800 material fatigue testing machine and EAH-900 high-temperature performance tester. The equipment adopts advanced sensor technology and precision control system, which can simulate the extreme working environment of aerospace materials, with a testing accuracy that meets the GJB national military standard. At the same time, EUATEC provides professional technical training and after-sales support to ensure the accurate operation of the equipment.

Cooperation Effect:

The application of the testing solution has effectively guaranteed the quality and safety of the enterprise's aerospace components. The material fatigue resistance and high-temperature performance testing data are accurate and reliable, providing a solid technical guarantee for the enterprise's product qualification. The enterprise's products have successfully passed the strict quality inspection of the aerospace industry, and the cooperation project has been highly recognized by the relevant national departments. The stable performance of the testing equipment has also reduced the enterprise's equipment maintenance cost by 45%.